NON-RESIDENTIAL FEES

MINIMUM CHARGE .... $69.00
EFFECTIVE September 8, 2014 through September 7, 2016 
Switches, lighting and receptacles to be counted as outlets.

ROUGH WIRING INSPECTION  
  1 to 25 outlets
  For each additional 10 outlets or fraction thereof
$31.00
$7.00
FINISH INSPECTION  
  to 25 outlets 
  For each additional 10 outlets or fraction thereof
$31.00
$7.00
EQUIPMENT, APPLIANCES  
  Outlet for single unit of 15 K.W. or less
  Each additional outlet of 15 K.W. or less 
$28.00
$10.00
MOTORS, GENERATORS, TRANSFORMERS, CENTRAL HEATING, DUCT HEATERS, AIR CONDITIONING, ELECTRIC FURNACES AND WELDERS  
Fractional HP, KW or KVA to 1 HP, KW or KVA, each   
1 HP, KW or KVA to 3 HP, KW or KVA, each
  4 KP, KW or KVA to 7 HP, KW or KVA, each
  7 1/2 HP, KW or KVA to 29 HP, KW or KVA, each
  30 HP, KW or KVA to 49 HP, KW or KVA, each
50 HP, KW or KVA to 74 HP, KW or KVA, each
75 HP, KW or KVA to 199 HP, KW or KVA, each  
  200 HP, KW or KVA to 500 HP, KW or KVA each
  Over 500 HP, KW or KVA, each
$16.00
$18.00
$28.00
$33.00
$51.00
$63.00
$127.00
$251.00
$316.00
FEEDERS OR SUB-PANELS (OVER 600 VOLTS ADD $115.00 PER CATEGORY)  
Not over 200 Amp
  Over 200 Amp. to 400 Amp
  Over 400 Amp. to 600 Amp
  Over 600 Amp. to 1600 Amp
  Over 1600 Amp
$29.00
$43.00
$54.00
$121.00
$167.00
SERVICE - METER EQUIPMENT UP TO 600 VOLTS
(GROUND FAULT PROTECTED SERVICES - ADD $86.00 OVER 600 VOLTS - ADD $115.00 PER CATEGORY SERVICES EXCEEDING 1 METER - $12.00 FOR EACH ADDITIONAL METER)
 
Not over 150 Amp. (One trip only*)
  Over 150 Amp. to 300 Amp. (One trip only*)
  Over 300 Amp. to 400 Amp
  Over 400 Amp. to 600 Amp 
  Over 600 Amp. to 1200 Amp
  Over 1200 Amp. to 1600 Amp   
  Over 1600 Amp. to 2000 Amp   
  Over 2000 Amp. to 3000 Amp
  Over 3000 Amp. *
  * Additional trip
$69.00
$69.00
$86.00
$109.00
$230.00
$259.00
$316.00
$374.00
$460.00
$29.00
PRIMARY TRANSFORMERS, VAULTS, ENCLOSURES, SUB-STATIONS
(APPLIES TO EACH BANK OF TRANSFORMERS )
 
  Not over 200 KVA 
  Over 200 KVA to 500 KVA
  Over 500 KVA to 1000 KVA
  Over 1000 KVA
$230.00
$288.00
$345.00
$403.00
SIGNALING SYSTEMS
Burglar Alarms, Fire Alarms, Fire Suppression Alarms, Smoke Detectors, Telemetering (Telephones or CATV outlets are each separate systems)
 
  For system and first (15) devices
  Each additional (10) devices or fraction thereof
$69.00
$7.00
MODULAR AND MOBILE HOMES (Single visit only)  
  Modular Homes, - Service and 25 Outlets or less 
  Mobile Homes - Service including 1 feeder or 1 receptacle....
  Feeder or power cord only
  Additional trip
$81.00
$63.00
$63.00
$29.00
SIGNS (INCANDESCENT, FLUORESCENT AND NEON)  
  First sign (per occupancy)
  Each additional sign (per occupancy)
$69.00
$10.00
OUTLINE LIGHTING  
  First transformer
  Each additional transformer
$63.00
$10.00
SWIMMING POOLS (Commercial by fee schedule)  
  Bonding (each trip)
  Equipment /Wiring (Residential Only)
$63.00
$75.00
   